The method of setting out is the reverse of
surveying process. The process involves the positions and levels of building
lines and road alignments shown on the construction plans to be established
on the ground by various techniques and instruments.

Methods
of Setting Out

  1. Setting out
    buildings by coordinates
  2. Setting out
    with theodolite and level
  3. Checking
    verticality
  4. Setting out
    and alignment in steel framed buildings
  5. Alignment and
    verticality in form work
  6. Control and
    calculation for route surveying

1. Setting Out Building by
Coordinates

A building can be set out by taking
referencing from an already established baseline. An irregular building or a
building having a complex geometry can be also be located using the same
method. For each corner of the building, a grid line can be established from
the baseline.

3. Checking Verticality:

To check verticality of points in a
building, the following surveying instruments can be used:
  1. Plumb Bob (For
    buildings less than 20m in height)
  2. Optical
    Plummet (A transparent plastic sheet is used as a target for checking
    verticality of tall buildings)
  3. Theodolite

Setting
out works also include

Computations and setting out Methods for:
  1. Simple Circular Curves
  2. Compound Curves
  3. Reverse curves
  4. Transition
    curves
  5. Vertical
    curves
google-site-verification=2j8Us0psP3GGjD12h0fH6_Z08_sRyWQjNbWcaMV4E9A

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *